get coordinated

Having replaced the boiler and re routed the plumbing earlier in the year this has enabled us to address the top floor bathroom. Most importantly we’ve managed to move the soil stack and waste to the outside of the house (which is always a preferable detail in my eyes than it routing down the living […]